[1]
J. Ferreira and D. José Casagrande, “THE IMPORTANCE OF REDUCING SETUP TIME IN THE PRODUCTION SYSTEM: case study using the PDCA methodology”, CITEC, vol. 16, no. 1, p. e16111, Aug. 2024, doi: 10.52138/citec.v16i1.349.