Abstract

Finding a mechanism or tool that makes it possible to reduce setup is extremely important and challenging for organizations, as it directly impacts the productivity and efficiency of operational processes. The PDCA cycle is much more than a simple methodology, it allows you to develop process improvements at an organizational level, in addition to increasing product quality and improvements in the manufacturing process. The objective of this article is to present how the application of the PDCA methodology can provide improvements in reducing setup time within the operations of a metallurgical industry. The research methodology used was bibliographical research and case study. At the end of this research, it was clear how PDCA is an effective methodology that brings good results. In the case study developed, it was possible to observe a reduction in setup time by 48.33% in the analyzed processes. This is a significant reduction time, which leads to increased productivity, more qualified employees and reduced production costs, enabling the company to increase its production capacity by using the same resources it already has.

Downloads

Download data is not yet available.

References

ANDRADE, F. F. de. O método de melhorias PDCA. Dissertação (Mestrado em Engenharia de Construção Civil e Urbana) – Escola Politécnica da Universidade de São Paulo, São Paulo, 2003. https://www.teses.usp.br/teses/disponiveis/3/3146/tde-04092003-150859/en.php. Acesso em: 19 abr. 2024.

BARTZ, Teonas; SILUK, Julio Cezar Mairesse; GARCIA, Mateus. Redução do tempo de setup como estratégia de aumento da capacidade produtiva: estudo de caso em sopradora de garrafas plásticas. Exacta, [S. l.], v. 10, n. 1, p. 47–57, 2012. Disponível em: https://periodicos.uninove.br/exacta/article/view/3224. Acesso em: 18 abr. 2024.

BORAN, S. EKINCIOĞLU, C. A novel integrated SMED approach for reducing setup time. The International Journal of Advanced Manufacturing Technology, v. 92, p.3941-3951, 2017.

CHIAVENATO, I. Introdução à Teoria Geral da Administração. 7.ed. Rev. e Amp. Rio de Janeiro: Elsevier, 2003.

DARMAWAN, H.; HASIBUAN, S.; HARDI-PURBA, H. Aplicação do conceito Kaizen com 8 etapas PDCA para reduzir defeitos de linha no processo de colagem: um estudo de caso em bateria automotiva. Internacional J. Adv. Ciência. Res. Eng. 2018 , v.4 , p. 97–107, 2018.

DESCIO, E.A.; BERNARDO, R.R. P. Implantação do Método PDCA como estratégia de padronização do processo em uma empresa de injeção plástica afim de minimizar a geração de refugos e peças defeituosas. 2023. Disponível em: https://www.google.com/url?sa=i&url=http%3A%2F%2F187.73.190.139%3A8080%2Fjspui%2Fhandle%2F123456789%2F370&psig=AOvVaw0cOZiLQ6_U455unU4aMK6U&ust=1724206846620000&source=images&cd=vfe&opi=89978449&ved=0CAcQr5oMahcKEwiAjKeWwYKIAxUAAAAAHQAAAAAQBA Acesso em: 19 abr. 2024.

EVANGELISTA, G. M. S., ARIMITSU, L. K., LIMA, A. DE, & CORRER, I. Proposta para redução de tempo de setup em células de usinagem com o uso de conceitos da metodologia SMED: Pesquisa-ação em uma empresa do setor de autopeças, 2018. Disponível em: chromeextension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.abepro.org.br/biblioteca/TN_STO_258_480_35526.pdf Acesso em: 19 abr. 2024.

FOGLIATTO, Flávio Sanson; FAGUNDES, Paulo Ricardo Motta. Troca rápida de ferramentas: proposta metodológica e estudo de caso. Gestão & Produção, [S.L.], v. 10, n. 2, p. 163-181, ago. 2003.

GONZALEZ, R.V.D.; MARTINS, M.F. Melhoria contínua e aprendizagem organizacional: múltiplos casos em empresas do setor automobilístico. Gestão & Produção, [S.L.], v. 18, n. 3, p. 473-486, 2011.

MARSHALL JUNIOR, I. Gestão da qualidade. 10. ed. Rio de Janeiro: FGV, 2010.

MIGUEL, P.A.C. Estudo de caso na engenharia de produção: estruturação e recomendações para a sua condução. Produção, São Carlos, v 17, nº 1, p. 216 – 229, janeiro/abril 2007.

MIGUEL, P.A.C.; SOUSA, R. O método do estudo de caso na engenharia de produção. In: MIGUEL, P.A.C. (Coord.). Metodologia de pesquisa em engenharia de produção e gestão de operações. 2.ed. Rio de Janeiro: Elsevier: APEBRO, 2012. p.131-148.

MÉNDEZ, J. D. M.; RODRÍGUES Set-up reduction in an interconnection axle manufacturing cell using SMED. The International Journal of Advanced Manufacturing Technology. v. 84, p.1907–1916, 2015.

NEUMANN, C.S.R.; RIBEIRO, J.L.D. Desenvolvimento de fornecedores: um estudo de caso utilizando a troca rápida de ferramentas. Production, [S.L.], v. 14, n. 1, p. 44-53, 2004.

PALADINI, E.P. Ferramentas para a gestão da qualidade. In: CARVALHO, M.M.; PALADINI, E.P. (Orgs.) Gestão da qualidade: teoria e casos. 2. ed. Rio de Janeiro: Elsevier (ABEPRO), 2012.

SOKOVIC, M.; PAVLÉTICO, D.; PIPAN, K.K. Metodologias de melhoria da qualidade – ciclo PDCA, matriz RADAR, DMAIC e FSS. J. Alcançar. Matéria. Fabrico. Eng. 2010 , 43 , 476–483, 2010.

RIBEIRO, F.A.N. Redução do tempo de setup e melhoria na eficiência pós setup de uma linha de envase de bebidas: um estudo de caso. 2020. https://repositorio.ufu.br/handle/123456789/34409 Acesso em 12 abr. 2024.

RODRIGUES, M.V. Ações para a qualidade: gestão estratégia e integrada para a melhoria dos processos na busca da qualidade e competitividade. 5. ed. Rio de Janeiro: Elsevier, 2014.

SANT’ANNA, O. H.; REGATTIERI, C. R. A redução de tempo de setup baseado na filosofia Lean Manufacturing. Revista Interface Tecnológica, [S. l.], v. 18, n. 2, p. 831–843, 2021.

SATOLO, E. G.; CALARGE, F. A. Troca Rápida de Ferramentas: estudo de casos em diferentes segmentos industriais. Exacta, São Paulo, v. 6, n. 2, p. 283-296, jul./dez. 2008.

SLACK, N.; CHAMBERS, S.; JOHNSTON, R. Administração da produção. 2. ed. São Paulo: Atlas, 2002.

TOLEDO, J.C. et al. Qualidade: gestão e métodos. São Paulo: Atlas, 2012.

VIEIRA, D. M., MORRA, L. F., CARVALHO, L. G. T., RODRIGUES JUNIOR, A. S. Estudo de Caso: Aumento da Produtividade através de metodologias do Lean Manufacturing. Revista Ibero-Americana de Humanidades, Ciências e Educação, 8(8), 1082–1092, 2022.

ZARPELON, Giovani Antônio. A importância da ferramenta SMED na linha de produção para redução de tempo de setup: uma revisão bibliográfica. Trabalho de Conclusão de Curso. 2023. https://repositorio.uninter.com/handle/1/1525 Acesso em: 18 abr. 2024.

ZOLA, F.C.; SOUZA, R.H.; MARINHO, L.H.N.; ARAGÃO, F.V. Redução do tempo de setup: uma proposta de melhoria aplicada a uma empresa do setor metal mecânico. R. Gest. Industr., Ponta Grossa, v. 14, n. 2, p. 77-95, abr./jun. 2018. Disponível em: https://periodicos.utfpr.edu.br/rgi. Acesso em: 18 abr. 2024.

Published

2024-08-29

How to Cite

FERREIRA, Junio; JOSÉ CASAGRANDE, Diego. THE IMPORTANCE OF REDUCING SETUP TIME IN THE PRODUCTION SYSTEM: case study using the PDCA methodology. Ciência & Tecnologia, [S. l.], v. 16, n. 1, p. e16111, 2024. DOI: 10.52138/citec.v16i1.349. Disponível em: https://publicacoes.fatecjaboticabal.edu.br/citec/article/view/349. Acesso em: 23 oct. 2024.

Issue

Section

Ingeniería, Tecnologías y Gestión.